Project Summary
AGPS provided full technical oversight, including interim management of operations and complete refurbishment of handling equipment at the Port of San Pedro.
Equipment
2 MHC Gottwald S6, 1 HMK300, 2 MHC Liebherr, 5 Reach Stackers
Key Actions
- Refurbishment of 6 Reach Stackers
- Maintenance of mobile harbor cranes
- Interim Technical Director support
- Liaison with operational and logistics teams
Key Result
- Reliable handling operations restored
- Transition phase fully stabilized